2019 Conference Presentations

The recordings of these presentations is proudly sponsored by Simtars

Goonawardene/Elliot – Proactive Floor Fracturing Using UIS Drilling


Rav Goonawardene
Geology and Geotechnical Superintendent, Anglo American – Grosvenor Mine

Ben Elliot
Trainee ERZ Controller, Anglo American – Grosvenor Mine

A series of floor heave and gas inrush events have occurred during the development mining process in MG103 and MG104 at Grosvenor Underground Coal Mine. These events have exposed coal mine workers to elevated levels of methane preventing safe mining operations.

The presence of an undrained source of gas in the immediate floor, geotechnical floor characteristics, loading environment and various other factors have contributed to the dynamic floor failure. Methane released during these events are originating from the underlaying thin Goonyella Middle Lower (GML) seam which is a thin carbonaceous layer with high ash content. The 1m – 5m interburden thickness between the GM seam and the GML has an increased likelihood of the floor gas release events.

Based on the analysis of these gas events, creating a conduit in the interburden between the GM seam and GML will allow the gas to freely release to the development roadway during development drivage. This will prevent the build up of gas within the interburden creating a floor gas release event.

The proactive interburden fracturing was initiated using water pressure generated from a longwall salvage pump. The current UIS drilling equipment was retrofitted with a series of subs, packers and a fracturing tool to initiate a hydro fracture within the drilled UIS borehole. Once the packers are fully inflated and in position, a diversion valve is then activated to allow the fracturing tool to inject high water pressure to the desired location. Thus, given the complexity of predicting verticality of the hydro fracture in the interburden, a UIS borehole was drilled in the lower section of the GM seam as proving hole to check the effectiveness of hydro fracture.

The main benefit of the proactive interburden fracturing process is having the ability to reduce the likelihood of exposing development coal mine workers at the face to high methane levels.

You may also like

Burnett - Grasstree Development Team Dust Suppression (2018 Winner)
Simon Burnett, Development Mechanical Coordinator, AngloAmerican – Grasstree Mine
Industry Sharing with Industry
In continuing with the desire from industry to share in key learnings from site-related incidents and following on ...
Viljoen- An Industry Without Fatalities
Natascha Viljoen Group Head of Processing, Anglo American Natascha is responsible for Group Processing, a ...
Parcell - Choices and Consequences – A discussion with Brant ‘Bugsy’ North
Brandt ‘Bugsy’ North, Safety Ambassador/Choices and Consequences Presenter, Downunder Group Solution Mark Parcell, ...
QMIHSC Legends Award for 2019
Daily Introduction by Master of Ceremonies Russell White, Managing Director, Driver Safety Australia Welcome by ...
Spinks - THE WAKE UP CALL…The Game Changer
Paul Spinks is the Game Changer: The Wake Up Call: Paramedic + Trauma Counsellor + Speaker Paramedic Paul Spinks ...
Opening session - Day 1, 2019 Conference
Introduction by Master of Ceremonies Russell White, Master of Ceremonies, Managing Director, Driver Safety ...

Page 9 of 11