Goonawardene/Elliot – Proactive Floor Fracturing Using UIS Drilling


Rav Goonawardene
Geology and Geotechnical Superintendent, Anglo American – Grosvenor Mine

Ben Elliot
Trainee ERZ Controller, Anglo American – Grosvenor Mine

A series of floor heave and gas inrush events have occurred during the development mining process in MG103 and MG104 at Grosvenor Underground Coal Mine. These events have exposed coal mine workers to elevated levels of methane preventing safe mining operations.

The presence of an undrained source of gas in the immediate floor, geotechnical floor characteristics, loading environment and various other factors have contributed to the dynamic floor failure. Methane released during these events are originating from the underlaying thin Goonyella Middle Lower (GML) seam which is a thin carbonaceous layer with high ash content. The 1m – 5m interburden thickness between the GM seam and the GML has an increased likelihood of the floor gas release events.

Based on the analysis of these gas events, creating a conduit in the interburden between the GM seam and GML will allow the gas to freely release to the development roadway during development drivage. This will prevent the build up of gas within the interburden creating a floor gas release event.

The proactive interburden fracturing was initiated using water pressure generated from a longwall salvage pump. The current UIS drilling equipment was retrofitted with a series of subs, packers and a fracturing tool to initiate a hydro fracture within the drilled UIS borehole. Once the packers are fully inflated and in position, a diversion valve is then activated to allow the fracturing tool to inject high water pressure to the desired location. Thus, given the complexity of predicting verticality of the hydro fracture in the interburden, a UIS borehole was drilled in the lower section of the GM seam as proving hole to check the effectiveness of hydro fracture.

The main benefit of the proactive interburden fracturing process is having the ability to reduce the likelihood of exposing development coal mine workers at the face to high methane levels.

You may also like

Lennon/Jacob - “Barrel Mate” Pump Barrel Rebuild Station
Michael Lennon – Mechanical Technician Glen Jacob – Mechanical Technician, Evolution Mining – Mt Rawdon
Noble - Data Log Hydraulic Tuning of Excavators
Jon Noble – Health Safety and Training Manager, Glencore – Clermont Open Cut Mine The Problem In February 2017 a ...
Roberts/Champion - Limiting Respirable Dust Exposure During Maintenance Activities
David Roberts – Maintenance Fitter Dave Champion – HSET Manager, Peabody-Millennium Mine
Donnelly - Mobile Bolting Platform for Installing Roof Support above an Operational Conveyer System
Michael Donnelly – Outbye Mining / Stonedust Coordinator, Glencore – Oaky Creek North Colliery
O’Reilly - Slide in Rollers
Troy O’Reilly – Risk, Safety & Compliance Advisor, Stanwell
Metz/Garlando - T282C Hytorc Reaction Post Set
Warren Metz – Graduate Engineer – Mechanical Matthew Garlando – Manager – Maintenance, Thiess
Burnett/Henderson - Grasstree Development Team Dust Suppression
Simon Burnett – Development Mechanical Coordinator, Anglo American Steven Henderson – Development Mechanical Trade ...
de Nysschen - Pneumatic Conveyed Stone Dusting System
Almeroe de Nysschen – Graduate Mechanical Engineer, Glencore – Oaky Creek North Colliery
Bahr - Tailings Dam Capping Scoop
Matthew Bahr – Operations Supervisor, Peabody Wilkie Creek Mine