2019 Conference Presentations

The recordings of these presentations is proudly sponsored by Simtars

Leppard – Synthetic Light Weight Couplings


Josh Leppard
Overburden Supervisor, BMA Saraji Mine

Tragically Saraji Mine had a fatality on New Year’s Eve 2018 involving a bulldozer rolling down an embankment. The first responders to this incident required the use of heavy duty slings and shackles to upright the dozer. This involved personnel traversing down a steep embankment on undulated ground during the night carrying D-shackles that weighed approximately 62kg each, this created a significant manual handling risks to the people involved.

Post incident, Saraji became aware of light weight synthetic couplings that are made specifically for the marine industry that significantly reduced the weight whilst providing exceptional strength properties.

We reached out to the manufacture of the light weight synthetic couplings in New Zealand in an attempt to replicate this technology within the mining industry. By substituting the existing steel D-shackle with a custom made light weight synthetic design, we have reduced the potential of a manual handling incident when recovering surface mobile equipment or the potential for stored energy within the steel to become airborne should the steel D-shackle capacity be exceeded.
The soft couplings were tested to 175,000 kg for a maximum breaking force (MBF) of 510,000 kg without breakage and have a total weight of 8.2 kg compared to the 62 kg steel D-shackles that are normally used.

The synthetic couplings have been successfully trialled on site to extract various pieces of surface mobile equipment. They have been included as mandatory items in the emergency equipment recovery trailer along with other items to aid in the immediate recovery should the need arise.

You may also like

Lennon/Jacob - “Barrel Mate” Pump Barrel Rebuild Station
Michael Lennon – Mechanical Technician Glen Jacob – Mechanical Technician, Evolution Mining – Mt Rawdon
Noble - Data Log Hydraulic Tuning of Excavators
Jon Noble – Health Safety and Training Manager, Glencore – Clermont Open Cut Mine The Problem In February 2017 a ...
Roberts/Champion - Limiting Respirable Dust Exposure During Maintenance Activities
David Roberts – Maintenance Fitter Dave Champion – HSET Manager, Peabody-Millennium Mine
Donnelly - Mobile Bolting Platform for Installing Roof Support above an Operational Conveyer System
Michael Donnelly – Outbye Mining / Stonedust Coordinator, Glencore – Oaky Creek North Colliery
O’Reilly - Slide in Rollers
Troy O’Reilly – Risk, Safety & Compliance Advisor, Stanwell
Metz/Garlando - T282C Hytorc Reaction Post Set
Warren Metz – Graduate Engineer – Mechanical Matthew Garlando – Manager – Maintenance, Thiess
Burnett/Henderson - Grasstree Development Team Dust Suppression
Simon Burnett – Development Mechanical Coordinator, Anglo American Steven Henderson – Development Mechanical Trade ...
de Nysschen - Pneumatic Conveyed Stone Dusting System
Almeroe de Nysschen – Graduate Mechanical Engineer, Glencore – Oaky Creek North Colliery
Bahr - Tailings Dam Capping Scoop
Matthew Bahr – Operations Supervisor, Peabody Wilkie Creek Mine

Page 10 of 11