The Problem

The rehabilitation of redundant Mine Service boreholes requires the shearing and removal of cemented 20” Steel casing at 1.5m below the ground surface.

This process previously required the entry into the excavation and the risk associated with the manual handling of a hydraulic saw device to cut the casing at required position.

During this cutting process the operators experienced several rotating blade failures that resulted in small shard of steel ejected from the saw blade and contacted the operator’s glove.

The Solution

The strategy to eliminate the hazards identified from investigation of the event; it was actioned to source an alternative device with the capacity to efficiently shear 20” cement encased steel casing, eliminating manual handling, exposure to excavation; via the functionality of remote operation.

The Diamond Wire Saw (DWS) device was identified, assessed and then progressed to primary design functional testing phase in December 2018. With positive observations of improved safety, efficiency and operational performance parameters.

During the trial and testing period, this involved collaboration and engagement of DWS OEM and test operators. The collaboration of stakeholders delivered engineering inputs combined with the collation of test operator feedback facilitated continuous improvement of the DWS device’s re-purposed application into an integrated mobile unit.

The Benefits

The field functional testing and operation of the DWS mobile unit demonstrated:

  • Elimination – of traditional rotating blade failure hazard – Guarded Diamond impregnated cable
  • Elimination – of manual handling – proximity protected – remotely controlled loader positions and retrieves DWS
  • Elimination – CMW entry into excavation – DWS utilizes self-attachment / release function
  • Elimination – of manual handling – proximity protected – remotely controlled loader secures the casing during cutting process and relocates to waste transport
  • Separation – remote operator console – remove CMW exposure to line of fire
  • Separation – remote operator console – remove CMW exposure to excavation
  • Operational effectiveness performance realized an increase of 60% on previous methodology

You may also like

Burnett - Grasstree Development Team Dust Suppression (2018 Winner)
Simon Burnett, Development Mechanical Coordinator, AngloAmerican – Grasstree Mine
Industry Sharing with Industry
In continuing with the desire from industry to share in key learnings from site-related incidents and following on ...
Viljoen- An Industry Without Fatalities
Natascha Viljoen Group Head of Processing, Anglo American Natascha is responsible for Group Processing, a ...
Parcell - Choices and Consequences – A discussion with Brant ‘Bugsy’ North
Brandt ‘Bugsy’ North, Safety Ambassador/Choices and Consequences Presenter, Downunder Group Solution Mark Parcell, ...
QMIHSC Legends Award for 2019
Daily Introduction by Master of Ceremonies Russell White, Managing Director, Driver Safety Australia Welcome by ...
Spinks - THE WAKE UP CALL…The Game Changer
Paul Spinks is the Game Changer: The Wake Up Call: Paramedic + Trauma Counsellor + Speaker Paramedic Paul Spinks ...
Opening session - Day 1, 2019 Conference
Introduction by Master of Ceremonies Russell White, Master of Ceremonies, Managing Director, Driver Safety ...

Page 9 of 11